Supply of steam and hot water boilers series DE, DKVr, KE, HF, HF-GM PTVM Packaging equipment (OWEN, MZTA, SIEMENS, Mitsubishi) Integrated automation of technological processes design in the construction and power system installation and commissioning of gas equipment Installation and start-boilers commissioning of boiler special place in the IBS Kotlomontazh takes the direction of integrated automation and gasification boilers in accordance with the requirements of SP 89.13330.2012. The main problems to be solved in the framework of re: Design for the FGP, FGPA, ATM, EM; supply and installation of units of gas valves; the minimum required grade of automation of the boiler or the creation of a powerful automated control system (ACS) to dispatch the boiler (workstation operator - APM RT); general boiler automation equipment for deaeration systems, network pumps, water treatment systems.